Planting Standards

Source: PEI Ecosystem-Based Forest Management Standards Manual (October 2025), pp. 4–5

These standards apply to every planting treatment: full, fill and enrichment planting.

Which sites qualify for which planting

What was growing on the site before disturbance decides which planting treatments are available.

Pre-disturbance covertype dominated by…Eligible for
White spruce, balsam fir, black spruce, eastern larch, white birch, trembling aspen, poor-quality red maple on low sites, plantation-grown red pineAll planting treatments
Red spruce, eastern hemlock, American beech, eastern white cedar, sugar maple, yellow birch, red oak, white pine, good-quality red maple on upland sitesNormally enrichment planting only
Any forest that has never been ploughedNormally enrichment planting only
Cleared land or former agricultural landPlanting (all cleared and past-agriculture land is eligible)

The second group is mostly the long-lived, shade-tolerant species of the original Acadian forest. The standards steer those stands toward enrichment rather than replacement.

Check natural regeneration first

Before any planting, assess whether the site already has enough appropriate natural regeneration — crop-tree species you would keep — to produce a viable stand.

Density and species choices

Handling seedlings

StepRequirement
TransportThe planter moves trees from the holding area (J. Frank Gaudet Tree Nursery or a district holding site) and between planting sites, in a vehicle that protects the seedlings
Holding on siteNo more than 30 hours from delivery to planting, stored so the seedlings cannot dry out
ToolsAll planting tools must be approved by the Department before planting starts
ReportingA planting report form stating the number of trees planted on the property, submitted within one day of finishing that property
ContainersPayment can be withheld until the empty planting containers are back at the nursery or holding area for collection

Quality standards for every seedling

CheckStandard
StockingWithin ±5% of the pre-treatment planting form. Payment may be capped at the prescribed stocking (or the permitted variance).
CoveragePlant the whole designated site wherever practical
MicrositeSomewhere with adequate moisture and drainage for vigorous growth
Stem angleAt least 75° from horizontal
RootsNot jammed into the hole, sharply bent, or twisted in a circle
FirmingSoil pressed around the plug or roots with fingers or foot and covered with mineral soil, leaving no air pockets
DepthThe top of the plug (or the root collar) no more than 2.5 cm below the surrounding mineral soil surface

Every planting site is assessed using Department-approved procedures that check both the quality and the number of seedlings planted.

Based on the PEI Ecosystem-Based Forest Management Standards Manual (October 2025), pp. 4–5. Where this guide and the manual differ, the manual governs.